Skip to content

Renew the CAS mount lease until a definitive answer; an expired lease is a pause - #2517

Merged
filimonov merged 9 commits into
antalya-26.6-20261008from
fix/antalya-26.6/cas-mount-renewal-until-definitive
Oct 19, 2026
Merged

filimonov merged 9 commits into
antalya-26.6-20261008from
fix/antalya-26.6/cas-mount-renewal-until-definitive

Fix the until-definitive GC observation test after the base merge

54d1258
Select commit
Loading
Failed to load commit list.
DCO-2 / DCO succeeded Oct 19, 2026 in 0s

Check passed!

All commits are signed off, the check passed.

Summary


Sha Message Pass or fail reason
🟢 22f20e5 Rename the CAS farewell request plane to the lease... Valid sign-off found
🟢 c057500 Add a CAS retry policy with no deadline and spaced... Valid sign-off found
🟢 fb57c5e Renew the CAS mount lease until a definitive answe... Valid sign-off found
🟢 bb5fa59 Keep the CAS decommission renewal bounded by the l... Valid sign-off found
🟢 57ae5a3 Pause CAS writes while the lease cannot admit one,... Valid sign-off found
🟢 bab8635 Test the until-definitive CAS renewal and the writ... Valid sign-off found
🟢 e3588e3 Describe the CAS renewal until a definitive answer... Valid sign-off found
🟢 d410298 Merge antalya-26.6-20261008 into the CAS renewal u... Skipped: sign-off not required in merge commit
🟢 54d1258 Fix the until-definitive GC observation test after... Valid sign-off found