You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Goal. See where usage is heading before the period ends, while there is still time to act. Today the page only shows what has already happened.
Build. One calculation, two places:
a dashed line on the chart, from today to the period end
a sentence under the meter, like "On track to use ~1.9M (94% of your limit) by 17 Aug", or that it lands over the limit
Hide it early in the period, where an average means very little. Pick the point: a number of days, or a share of the period.
Never on a rolling window. Free plans have no period end to project to, and their total can fall as old days drop out, so a projection there is misleading rather than merely early.
Call it an estimate. A straight-line average of usage so far, not a forecast.
Needs #8257. The projection divides by the period length, which the API does not return today.
Done when
the projection appears in both places once there is enough of the period to mean anything, and in neither before
a projection that lands over the limit is obvious without working it out
Activity
[-]Project end-of-period usage at the current run rate[/-][+]Show projected end-of-period usage[/+]fix(usage): drop the tile that repeated the headline
fix(usage): drop the tile that repeated the headline
feat(usage): project end-of-period usage
feat(usage): show where usage is heading
feat(usage): show where usage is heading
feat(usage): show where usage is heading