Skip to content

ci: leave the recovery database groups to the merge queue - #1021

Merged
Medformatik merged 1 commit into
mainfrom
ci/defer-recovery-groups
Nov 16, 2026
Merged

Medformatik merged 1 commit into
mainfrom
ci/defer-recovery-groups

Conversation

@Medformatik

Copy link
Copy Markdown
Collaborator

What changed and why

The main protection ruleset requires the merge queue since today, so pull requests no longer need to run the three recovery database groups themselves. This lists crash-points, configuration-recovery and coordinator-recovery in mergeQueueDatabaseGroups, which removes 12 jobs and about 144 job-minutes from every pull-request run. The merge queue, main and the daily schedule still run them.

  • A pull request that breaks one of these groups now passes its own run and is refused by the queue, so the failure shows up at merge time instead of on the push.
  • The switch is read from main only, so this pull request's own run still executes every group. It takes effect for pull-request runs that start after this merges.
  • The governance runbook, the CI notes and the contributing guide now describe merging through the queue with the settings the ruleset actually has.

This is also the first pull request to go through the queue, so its merge is the first real merge_group run of the five required workflows.

Verification

  • The ruleset was read back through the API: merge queue required, squash, build concurrency 2, group size 1 to 3, every entry must pass, 90-minute check timeout.
  • The four CI plan and contract test files pass (82 tests), including the test that the rollout file lists exactly the deferrable groups.
  • Not verified yet: the merge_group run itself, and the first pull-request run with the three groups left out. Both can only happen after this is queued and merged.

Release and upgrade impact

Product impact: ordinary

The main ruleset now requires the merge queue, which runs every database group for each entry. Pull-request runs drop crash-points, configuration-recovery and coordinator-recovery: 12 jobs and about 144 job-minutes per run.
@Medformatik Medformatik added the ci Continuous integration and GitHub Actions changes label Nov 16, 2026
@Medformatik Medformatik self-assigned this Nov 16, 2026
@Medformatik
Medformatik merged commit 4292c7a into main Nov 16, 2026
4 checks passed
@Medformatik
Medformatik deleted the ci/defer-recovery-groups branch November 16, 2026 17:49
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

ci Continuous integration and GitHub Actions changes

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant