Skip to content

CI: Rolling removed APIs that fuse and its pinned deps use; choose a CI distro strategy #41

Closed

Description

@griswaldbrooks

Problem

fuse CI builds on the floating osrf/ros:rolling-desktop-full image, and Rolling has since removed APIs that fuse and two of its pinned dependencies still use. The build now fails before any fuse code compiles, so no PR can go green. #38 (approved) is blocked on this.

main uses the same Dockerfile and dependency pins, so it should fail the same way. That isn't confirmed directly, because GitHub has no retained main runs.

PickNik ships fuse as ros-jazzy-fuse (pinned in moveit_pro's Dockerfile). The breakage is Rolling-only.

What breaks on Rolling

# Where Cause Status
1 dependencies/covariance_geometry_ros (pinned 182993b) calls ament_target_dependencies, removed in ament_cmake 2.8.5 Fixable: upstream 6a854f7 already migrated
2 fuse_optimizers/CMakeLists.txt:51 same removed call Fixable: link diagnostic_updater::diagnostic_updater instead
3 dependencies/tf2_2d (pinned 41b3d5b) tf2_2d.hpp:40 and test_conversions.cpp:36 include <tf2/transform_datatypes.h>, removed from Rolling tf2 No upstream fix: none of tf2_2d's 26 branches drop it

Fixes 1 and 2 are done on a local branch and build past the first error. Fix 3 is where we stopped, because it needs a decision. More Rolling breakage may show up after it.

Options

A. Build CI on Jazzy, what we ship (recommended)

  • Smallest change: switch the CI image to Jazzy.
  • Tests the configuration customers actually get.
  • Downside: we stop seeing Rolling breakage until we move to the next distro.

B. Patch tf2_2d and keep Rolling CI

  • Carry a PickNik fork or patch of tf2_2d, and offer the fix upstream.
  • Keeps early warning for the next ROS distro.
  • Downside: we own a fork, and Rolling will keep breaking us, so this is recurring work.

C. Pin the Rolling image to a date before these removals

  • Quick unblock.
  • Downside: the pin goes stale, hides real breakage, and has to be revisited anyway.

A and B can be combined: Jazzy as the required check, plus Rolling as an optional, non-blocking job.

Decision needed

Which option should fuse CI follow? Once that's decided, #38 and its stacked follow-up can merge.

Activity

  1. griswaldbrooks commented on Nov 4, 2026

    @griswaldbrooks
    Author
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Labels

No labels
No labels

Type

No type

Projects

No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions