Repository navigation
DCO-2 / DCO
succeeded
Oct 19, 2026 in 1s
Check passed!
All commits are signed off, the check passed.
Summary
| Sha | Message | Pass or fail reason | |
|---|---|---|---|
| 🟢 | f88e301 | install: Add /var and /etc migration options | Valid sign-off found |
| 🟢 | 734268c | install: Optimize /var migration across directory ... | Valid sign-off found |
| 🟢 | 4b4f5cf | tmt: Add single-guest package-mode migration test | Valid sign-off found |
| 🟢 | 2ea7c45 | install: Skip nested mounts during var migration | Valid sign-off found |
| 🟢 | 96cb06e | install: Reopen O_PATH dirs for var metadata | Valid sign-off found |
| 🟢 | 6ea15fe | tmt: Support Testing Farm workdir path | Valid sign-off found |
Loading