Repository navigation
Conversation
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This was referenced Nov 29, 2026
This branch has not been deployed
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
A first capabilities map for Visual Notes: 148 capabilities in 20 product areas under
docs/capabilities/, each with a one- or two-sentence promise and the exact code and tests behind it. It is a draft for review: the question is whether the promises describe the product.What to do with it
Read two areas, about 10 minutes in all, and say whether the promises describe the product (TASK-0100 W3.3):
docs/capabilities/collections.yaml: the area the schema example came from, 16 capabilities.docs/capabilities/notes.yaml: the largest area, 21 capabilities and 29,390 allocated LOC.If they read right, the next steps are the CI lint (W3.4) and the capability treemap in Srcly (W3.5). Neither is in this PR. Nothing in the app changes.
Areas
notes)collections)people)visual-map)research)pathways)events)archive)cleanup)tasks)time-blocks)app-shell)annotations)ai)note-audio)note-paths)activity)mcp-connector)admin)sharing)"Allocated LOC" splits a shared file equally among the capabilities that claim it.
Proof
srcly capabilities check(byronwall/srcly#502) passes on this branch againstorigin/main:The lint fails on an unclaimed new file and passes after the map claims it. I added
app/src/lib/events/week-agenda.ts, then put it under theeventscapability, then removed both:The map was drafted with the recipe in srcly's
skills/srcly-capabilities/SKILL.md. Four agents each read a disjoint part of the code and its tests, and I drafted the shell, connector, activity, inbox and admin areas and swept the rest.Limits
sandbox/pathways/prototype copy (about 4,600 LOC),prisma/schema.prisma, dev and audit scripts, Panda theme recipes, the landingsite/, and cleanup experiment scripts.note-viewandarchive-adminlink only route smoke tests. These are the "weak tests" the treemap should show.only:narrows 3 shared code files (group.ts,cleanup.actions.ts,archive.actions.ts) and 12 test files to named declarations or test titles. All other claims are whole files.Stack: capabilities map
What splits: the first capabilities map for Visual Notes, and the CI job that keeps it current.
Why it splits: the map is for reading against the product; the job is a gate. You can approve the map's promises without the gate, and the gate needs the map to pass.
Why this split: a single PR would mix a review of product wording with a review of CI. Splitting by area file was rejected: the map only makes sense as one whole.
Capabilities mapCI job and the agent rule.🤖 Generated with Claude Code