You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
TASK: Configure SIT transfer risk threshold for step-up acceptance #266
Type: Task
Parent: TASK: Publish MFA assurance and resume transfer saga (#208)
Epic: Step-Up Authorization
Sprint: Sprint 4 - Secure Customer Access and Step-Up Authorization
Service: transaction-service
Priority: P0
Objective
Enable one deterministic high-value SIT transfer to enter AWAITING_STEP_UP so the merged MFA assurance and Transaction Service continuation can be accepted end to end.
Scope
Add the minimal non-secret transaction.risk SIT policy configuration.
Use the existing configured policy evaluator and keep the threshold above the normal low-value smoke transfer.
Do not alter risk evaluator code, public routes, authorization, balances, or AWS/UAT/PROD configuration.
Acceptance criteria
A high-value synthetic AED transfer receives REQUIRE_STEP_UP and persists AWAITING_STEP_UP.
A low-value synthetic transfer remains eligible for the existing normal flow.
It adds only the existing Transaction Service SIT policy threshold AED: 500.0000 with a five-minute decision TTL. This is required for a deterministic high-value transfer to enter AWAITING_STEP_UP; no application code, public API, CI job, or UAT/PROD configuration changed.
Completed: Config Repo PR #50 is merged; Config Server serves the AED 500 SIT threshold; Transaction Service restarted and direct synthetic verification returned HTTP 201 with AWAITING_STEP_UP. Gateway stale-image correction is tracked on #208.
Activity
ramioooz commentedon Sep 10, 2026
SIT risk policy PR is ready: digital-bank-java/config-repo#50
It adds only the existing Transaction Service SIT policy threshold
AED: 500.0000with a five-minute decision TTL. This is required for a deterministic high-value transfer to enterAWAITING_STEP_UP; no application code, public API, CI job, or UAT/PROD configuration changed.ramioooz commentedon Sep 10, 2026
Completed: Config Repo PR #50 is merged; Config Server serves the AED 500 SIT threshold; Transaction Service restarted and direct synthetic verification returned HTTP 201 with AWAITING_STEP_UP. Gateway stale-image correction is tracked on #208.